Fernhill Informal Track Upgrade
TROW Group has been engaged to upgrade the existing informal track at Fernhill, improving its safety, stability, drainage and overall accessibility while retaining the natural character of the surrounding area. The project will focus on upgrading the existing track rather than creating an entirely new route. Works will be carried out progressively along the track, with particular attention given to areas that are uneven, unstable, affected by water runoff or require improved steps and transitions. The upgrade will also improve the connection between the track and the existing boardwalk, helping create a safer and more consistent experience for people using the track.



Project History
he Fernhill track is an existing informal walking route that has developed over time and includes a range of natural and constructed features, including uneven sections, exposed tree roots, steps, drainage areas and a connection to the existing boardwalk. As the track has been used over time, some sections require improvement to provide a safer and more stable walking surface. The project has been developed to address these areas while working carefully within the existing environment. The upgrade will retain as much of the existing track and natural environment as practicable, with works focused on improving the areas that require attention rather than unnecessarily disturbing the surrounding landscape.
What We're Doing
The project will include a range of improvements along the existing track, including: - Reforming and improving sections of the existing track - Minor realignment of unstable or unsuitable sections - Installing and upgrading steps and staircases - Improving the connection between the track and existing boardwalk - Installing track edge boards - Improving drainage and water runoff - Installing wayfinding bollards - Removing vegetation and obstructions where required - Completing final trimming, clean-up and reinstatement The aim is to create a safer, more stable and durable track while maintaining the natural character of the area.
Track Improvements
The existing track will be progressively re-formed to create a more stable and suitable walking surface. This may involve removing unsuitable material, trimming high areas, filling low areas and reshaping sections of the track. Aggregate will be placed and compacted to provide a stable finished surface.
The track will also be shaped to encourage water to move away from the walking surface, helping reduce ponding, erosion and damage caused by water running along the track. Where sections of the existing route are unstable or unsuitable, minor realignment may be undertaken to provide a safer and more stable route.
Our Approach
The Fernhill upgrade is about improving the existing track while respecting the natural environment it sits within. TROW will work progressively and carefully throughout the site, with a focus on safety, quality, environmental protection and minimising unnecessary disturbance.
What You Can Expect
While works are underway, sections of the track may be temporarily restricted or unavailable while construction activities are taking place. This is necessary to keep the public and project team safe and to allow machinery, materials and construction activities to be managed safely. The project team will work to keep disruption to a minimum and maintain a safe environment around active work areas. Updates will be provided through this Project Updates Hub as the project progresses.