27A-B Don Buck Road, Henderson
Projects
deconstruction (residential)

27A-B Don Buck Road, Henderson

Completed

2026

Deconstruction Progress100%
27 Don Buck Road, Henderson
Client: Auckland Council
Jul 2026
104.36t
Total Tracked
98.5t
Diverted
5.86t
Landfill
94%
Diversion Rate

Waste Breakdown

Distribution by category

HardfillRecyclingReuseLandfill
  • Hardfill
  • Recycling
  • Reuse
  • Landfill

Amounts by Category

Tonnes per waste stream

HardfillRecyclingReuseLandfill0255075100

Line Item Breakdown

Detailed items per waste category

Hardfill84.4 t
MaterialsWeightDestination
Bricks14.4 tonnesTROW Yard
Concrete (Foundation, Piles, Steps, Tanks etc)70 tonnesTROW Yard
Recycling5.42 t
MaterialsWeightDestination
Insulation (Polyester or EPS)0.15 tonnesEnviro NZ
Timber separated on site for recycling4.77 tonnesEnviro NZ
Metals - wiring, roofing (incl. non-asbestos decramastic), framing, pipe etc0.5 tonnesPhoenix Metal Recyclers
Reuse7.01 t
MaterialsWeightDestination
Bathroom - shower, bath, basin, toilet0.63 tonnesTROW ReStore Customer
Kitchen - joinery0.22 tonnesTROW ReStore
Kitchen - benchtop0.2 tonnesTROW ReStore Customer
Windows (Al, 2-panel, single glazed) 0.28 tonnesTROW ReStore
Carpets/Underlay0.45 tonnesTROW ReStore
Garage door - double0.12 tonnesTROW ReStore
Garage door - auto openner0.04 tonnesTROW ReStore
Ranch / french / bifold style doors (single glazed)0.18 tonnesTROW ReStore
Garage door - single0.07 tonnesTROW ReStore
Doors - Internal (with Jamb)0.36 tonnesTROW ReStore
Doors - External (with jamb)0.24 tonnesTROW ReStore
Roofing - Concrete tile2 tonnesTROW ReStore
Timber - Pine Roof Trusses1.42 tonnesTROW ReStore
Timber - Framing (4x2 Pine)0.8 tonnesTROW ReStore
Landfill5.86 t
MaterialsWeightDestination
General C&D Waste direct to landfill1.91 tonnesEnviro NZ
Plasterboard (eg 9mm gibboard)3.95 tonnesEnviro NZ
Hardfill84.4 t total
Bricks14.4 t
Concrete (Foundation, Piles, Steps, Tanks etc)70 t
Recycling5.42 t total
Insulation (Polyester or EPS)0.15 t
Timber separated on site for recycling4.77 t
Metals - wiring, roofing (incl. non-asbestos decramastic), framing, pipe etc0.5 t
Reuse7.01 t total
Bathroom - shower, bath, basin, toilet0.63 t
Kitchen - joinery0.22 t
Kitchen - benchtop0.2 t
Windows (Al, 2-panel, single glazed) 0.28 t
Carpets/Underlay0.45 t
Garage door - double0.12 t
Garage door - auto openner0.04 t
Ranch / french / bifold style doors (single glazed)0.18 t
Garage door - single0.07 t
Doors - Internal (with Jamb)0.36 t
Doors - External (with jamb)0.24 t
Roofing - Concrete tile2 t
Timber - Pine Roof Trusses1.42 t
Timber - Framing (4x2 Pine)0.8 t
Landfill5.86 t total
General C&D Waste direct to landfill1.91 t
Plasterboard (eg 9mm gibboard)3.95 t