Projectsdeconstruction (residential)
27A-B Don Buck Road, Henderson
Completed
2026
Deconstruction Progress100%
27 Don Buck Road, Henderson
Client: Auckland Council
Jul 2026
104.36t
Total Tracked
98.5t
Diverted
5.86t
Landfill
94%
Diversion Rate
Waste Breakdown
Distribution by category
- Hardfill
- Recycling
- Reuse
- Landfill
Amounts by Category
Tonnes per waste stream
Line Item Breakdown
Detailed items per waste category
Hardfill84.4 t
| Materials | Weight | Destination |
|---|---|---|
| Bricks | 14.4 tonnes | TROW Yard |
| Concrete (Foundation, Piles, Steps, Tanks etc) | 70 tonnes | TROW Yard |
Recycling5.42 t
| Materials | Weight | Destination |
|---|---|---|
| Insulation (Polyester or EPS) | 0.15 tonnes | Enviro NZ |
| Timber separated on site for recycling | 4.77 tonnes | Enviro NZ |
| Metals - wiring, roofing (incl. non-asbestos decramastic), framing, pipe etc | 0.5 tonnes | Phoenix Metal Recyclers |
Reuse7.01 t
| Materials | Weight | Destination |
|---|---|---|
| Bathroom - shower, bath, basin, toilet | 0.63 tonnes | TROW ReStore Customer |
| Kitchen - joinery | 0.22 tonnes | TROW ReStore |
| Kitchen - benchtop | 0.2 tonnes | TROW ReStore Customer |
| Windows (Al, 2-panel, single glazed) | 0.28 tonnes | TROW ReStore |
| Carpets/Underlay | 0.45 tonnes | TROW ReStore |
| Garage door - double | 0.12 tonnes | TROW ReStore |
| Garage door - auto openner | 0.04 tonnes | TROW ReStore |
| Ranch / french / bifold style doors (single glazed) | 0.18 tonnes | TROW ReStore |
| Garage door - single | 0.07 tonnes | TROW ReStore |
| Doors - Internal (with Jamb) | 0.36 tonnes | TROW ReStore |
| Doors - External (with jamb) | 0.24 tonnes | TROW ReStore |
| Roofing - Concrete tile | 2 tonnes | TROW ReStore |
| Timber - Pine Roof Trusses | 1.42 tonnes | TROW ReStore |
| Timber - Framing (4x2 Pine) | 0.8 tonnes | TROW ReStore |
Landfill5.86 t
| Materials | Weight | Destination |
|---|---|---|
| General C&D Waste direct to landfill | 1.91 tonnes | Enviro NZ |
| Plasterboard (eg 9mm gibboard) | 3.95 tonnes | Enviro NZ |
Line Item Distribution
Hardfill84.4 t total
Bricks14.4 t
Concrete (Foundation, Piles, Steps, Tanks etc)70 t
Recycling5.42 t total
Insulation (Polyester or EPS)0.15 t
Timber separated on site for recycling4.77 t
Metals - wiring, roofing (incl. non-asbestos decramastic), framing, pipe etc0.5 t
Reuse7.01 t total
Bathroom - shower, bath, basin, toilet0.63 t
Kitchen - joinery0.22 t
Kitchen - benchtop0.2 t
Windows (Al, 2-panel, single glazed) 0.28 t
Carpets/Underlay0.45 t
Garage door - double0.12 t
Garage door - auto openner0.04 t
Ranch / french / bifold style doors (single glazed)0.18 t
Garage door - single0.07 t
Doors - Internal (with Jamb)0.36 t
Doors - External (with jamb)0.24 t
Roofing - Concrete tile2 t
Timber - Pine Roof Trusses1.42 t
Timber - Framing (4x2 Pine)0.8 t
Landfill5.86 t total
General C&D Waste direct to landfill1.91 t
Plasterboard (eg 9mm gibboard)3.95 t